What the work includes
- Debris removal and haul-away coordination
- Drywall dust removal from surfaces and vents
- Adhesive, paint and overspray removal
- Window and frame cleaning
- Floor scrubbing and polishing
- Final touch-up after punch list
- Photo documentation for handover
What drives the price
Quotes for the same square footage can differ by half. These are the variables that move the number in Seattle.
| Factor | Why it matters |
|---|---|
| Phase | Rough, final and touch-up cleans are separate passes with different labor. |
| Dust volume | Drywall and concrete cutting produce fine dust that requires HEPA equipment and repeat wiping. |
| Access | No elevator, tight stairwells or occupied buildings slow the crew. |
| Deadline | 48 hour mobilization and night shifts carry a premium. |
| Disposal | Dumpster, hauling and recycling fees are often billed separately. |
Vendors for post-construction cleaning
We are onboarding verified vendors for this category. Send a request and we will tell you within one business day whether we can cover it, instead of forwarding it to someone we have not checked.
Read before you call
Post-construction cleaning: common questions
How is post-construction cleaning priced?
Per square foot for predictable projects, or a fixed project bid after a walkthrough. Small remodels under 2,000 sq ft are usually bid as a lump sum.
Who pays for it, the contractor or the owner?
Usually the general contractor includes it in the handover scope. On tenant improvements it is often the tenant's line item.
How long does a final clean take?
A 5,000 sq ft tenant improvement takes 2 to 4 crew days for the final pass, plus a half day touch-up after the punch list.
Do you need HEPA equipment?
Yes for drywall and concrete dust. Standard vacuums recirculate fine particulate and the job fails a white-glove inspection.