Seattle · King County · South Sound Independent directory · Updated November 2026

Guide · 6 min · updated November 25, 2026

How to switch cleaning vendors without downtime

A 30-day transition plan for replacing a janitorial contractor: notice, keys, supplies, inspections, and the first-month checklist that prevents a quality drop.

Start with the contract, not the new vendor

Most switches fail because the old contract has no exit. Read three clauses before anything else:

  • Notice period. Usually 30 days, sometimes 60. Missing it costs an extra month.
  • Termination for cause. Look for a cure period and what counts as a repeated failure.
  • Equipment and supplies. Who owns the vacuum, the cart, the key log, the supply inventory.

If notice is 30 days, the new vendor’s start date is day 31. Do not let the new crew start before the old contract ends; overlapping access creates liability and confusion over keys.

The 30-day plan

Day Task
1-3 Send written notice, confirm the last service date
4-7 Finalize scope and schedule with the new vendor
8-14 Collect insurance, L&I, key log, alarm codes
15-21 Walk the building with the new supervisor, mark problem areas
22-28 Deep clean or reset before handover, order supplies
29-30 Change locks or codes, deactivate old badges, final inspection
31 New crew starts, supervisor on site for the first two nights

Keys, codes and badges

Change what can be changed. Rekeying is cheaper than a theft claim, and alarm codes should be rotated the same week. Keep a written key log with names and dates, and deactivate badges the day the old contract ends.

The first-month inspection

Inspect on day 3, day 14 and day 30. Use the same list each time: restroom grout, under-desk dust, breakroom sink, elevator tracks, trash room. Take photos. Vendors respond to evidence, not impressions.

What to tell the building

Tenants notice a new crew immediately. A short note to tenants with the new schedule and a contact for issues prevents a week of complaints that are really just uncertainty.

Common mistakes

  • Starting the new vendor before the old one is formally done
  • Reusing supplies left behind without checking expiration
  • No written scope, only a verbal walkthrough
  • Skipping the day-3 inspection because “it looked fine”
  • Forgetting to update the alarm call list

If the old vendor refuses to leave

That is a contract problem, not a cleaning problem. Send notice in writing, keep proof of delivery, document any access interference, and consult an attorney if keys or equipment are withheld. In Washington, a written notice with a delivery receipt is the difference between a clean exit and a month of argument.

Sources

Numbers marked as planning ranges are not quotes. Confirmed Seattle ranges are published with the collection date and sample size.