Guide · 8 min · updated November 24, 2026

Janitorial RFP template for Seattle buildings

A copy-ready request for proposal structure that makes cleaning bids comparable, with scope tables and evaluation criteria.

Why most cleaning RFPs fail

They ask for a price before defining the work. Vendors then price different scopes, and the “lowest bid” is usually the smallest scope. A useful RFP is 80 percent specification and 20 percent commercial terms.

Section 1. Building profile

  • Address and square footage by floor
  • Occupancy: headcount, hours, visitor volume
  • Restroom count and fixture count
  • Floor types and square footage by type
  • Kitchen and breakroom description
  • Access rules: keys, fobs, escort, elevator booking

Section 2. Scope of work

Build a table with one row per task:

Area Task Frequency Standard
Restrooms Clean and disinfect all fixtures 3x per week No visible soil, restocked
Floors Vacuum all carpet 3x per week No debris in corners
Kitchen Wipe counters and sink 3x per week No residue, trash emptied
Entry Clean glass doors 3x per week No fingerprints
Floors Extract carpet 2x per year Vendor proposes method

“Standard” is the part most RFPs skip, and it is what you enforce later.

Section 3. Supplies and equipment

State who provides paper, soap, liners, chemicals and equipment. If the vendor provides, require SDS sheets and a product list. If you provide, state the storage location.

Section 4. Staffing and supervision

  • Number of cleaners per visit
  • Named supervisor and visit frequency
  • Background check policy
  • Training program and language coverage

Section 5. Insurance and compliance

  • UBI number
  • General liability certificate, additional insured
  • Workers compensation account
  • Bond if keys are held
  • Safety program and incident reporting

Section 6. Pricing format

Require this exact structure so bids compare:

  1. Monthly routine price
  2. Price per additional visit
  3. Hourly rate for extra work
  4. Periodic work, priced per task
  5. Supplies, monthly
  6. Annual increase cap

Section 7. References and site visit

Two references in comparable buildings, plus a mandatory walkthrough. Vendors who bid without walking the building are guessing.

Section 8. Evaluation criteria

Criterion Weight
Scope compliance 30%
Price and pricing structure 25%
Supervision and staffing 20%
References and track record 15%
Insurance and compliance 10%

Score before you discuss price. Otherwise the cheapest number anchors the whole decision.

Timeline

Week Step
1 Issue RFP, schedule walkthroughs
2 Walkthroughs and questions
3 Bids due, clarifications
4 References, selection, contract
5 Mobilization and first inspection

Contract attachments

Attach the scope table, the supply list, the insurance requirements and the inspection form. The scope table should be referenced in the contract, not summarized.

Sources

Numbers marked as planning ranges are not quotes. Confirmed Seattle ranges are published with the collection date and sample size.